Own your data center.
Hassle Free.

Own the asset without the construction risk. AI-ready modules delivered to your site in 120 days. Capitalized as hardware, operated as a service.

120-Day Delivery
Prefab Concrete Shells
Built for Nvidia Reference Architectures

The Hardware Menu

Select your chassis. Configure your spec. Deploy globally.

Standard Compute 1

Standard Compute 1

Balanced Enterprise Workloads

  • Density10-50 kW / Rack
  • Capacity20-50 Racks
  • CoolingAir / Hybrid
View Specs
Inference Module

Inference Module

Mid-scale AI Inference (H100)

  • Density40-70 kW / Rack
  • Capacity20-30 Racks
  • CoolingLiquid Ready (DLC)
View Specs
Telco Node

Telco Node

Edge Computing / 5G

  • Density3-8 kW / Rack
  • Capacity10-20 Racks
  • CoolingDX / Free Cooling
View Specs

Deploy CapEx at
Your Own Pace.

Simulated Deployment: React to the market in 4-month increments.

Inv
Empty
Slot
Empty
Slot
Empty
Slot
Empty
Slot

From Node...

...To Campus...

...To Constellation.

Bleeding Edge
Module 01
HUB 01
Bleeding Edge
Module 1
Bleeding Edge
Module 2
Bleeding Edge
Module 3
Bleeding Edge
Module 4
Bleeding Edge
Module 5
Bleeding Edge
Module 6
Concrete Data Center Module
Fortress Grade Infrastructure

Not a Container.
A Bunker.

Prefabricated reinforced concrete. Ballistic rated. Weatherproof. The speed of modular, with the permanence of a fortress.

Prefab Concrete

Far more robust than containers. Fire-resistant, ballistic-rated, and built for 50-year longevity.

Outdoor Ready

Weatherproof and secure by default. Deploy on a slab outdoors or inside a warehouse.

Tier III+ Resiliency

Resilient backbone ready for mission-critical workloads. N+1 Cooling and 2N Power.

Integrated Security

CCTV, access control, and monitoring are built-in, not bolted on.

Manufactured. Not Constructed.

We moved the construction site to the factory floor. By manufacturing our own proprietary components, we eliminate vendor delays and guarantee 120-day delivery.

Vertical Integration

We manufacture our own Fanwalls, Power Skids, and Fiber Trays. Zero dependency on external vendor backlogs.

Factory Precision

Controlled environments eliminate weather delays and ensure consistent, high-quality finishes every time.

Parallel Execution

We build your modules in the factory while simultaneously prepping the site. Delivery in 120 days flat.

Battle-Tested Topologies

Proven, standardized engineering designs replicated at speed. No experimental custom one-offs.

Hyperscale Campus

Need Hyperscale?

For multi-MW campuses, we deploy custom-designed footprints using our modular supply chain.