CAPACITY LIVE

Fortress-Grade Colocation
for the Age of AI.

Modular bunkers built for high-density inference. Manage your physical footprint with the speed of software.

Tier IV reliability
Carrier neutral
Operations as a platform
BMS CONSOLE // LIVE
ID: BE-QRO-1-A04
Rack Row A // Power Draw
45.2 kW
PEAK LOAD
Optimized
Fabric Throughput
3.1 Tbps
Stable
Cold Aisle Temp
22.4°C
Engaged
Perimeter Defense
Zone 4 Locked

Software-Defined Operations.

We replaced the clipboard with code. Manage physical infrastructure with the speed and transparency of a cloud platform.

Frictionless Access

Smart Access Control

Pre-register visitors, assign specific zones, and generate digital keys instantly. No clipboard required.

Visitor Pass
Data Hall A
Access Granted
Zero-Touch Logistics

Receiving & Staging Hub

Ship directly to us. We receive, unbox, scan serials, and stage your hardware. Track inbound inventory in real-time.

09:00
Truck Arrived
10:15
Unboxed & Staged
10:30
Inventory Updated (32 Assets)
Traceable

Evidence-Based Support

Request remote hands and get photo evidence.

Technician shared an attachment

rack_a4_cabling.jpg
Verified
Instant

API-Driven Cross Connects

Provision interconnections in hours.

SLA: 4h remaining
Live Telemetry

Real-Time Visibility

Monitor power draw and thermals.

Live
TECHNICAL SPECIFICATIONS

The AI-Ready Bunker

Purpose-built infrastructure for high-performance computing. Validated designs for H100/H200 clusters.

Extreme Power Density

10kW to 50kW per rack. Liquid cooling ready.

Liquid Ready

N+1 Chillers. Waterless closed loop.

ATS

2N Redundancy

Fault-tolerant topology. Dual active feeds.

7-Layer Defense

Biometrics, mantraps, 24/7 armed guard.

Carrier Neutral Fabric

<3ms Latency to regional hubs. Dark fiber ring.

STRATEGIC REACH

Instant Multitenant Capacity.

Deploy 10kW to 50kW racks in our live locations. Select your density, cooling, and connectivity profiles.

Available Locations

LIVE

Querétaro QRO1

Available
3 MW TotalCarrier Neutral
Expansion Roadmap
MonterreyMTY2
6 MWComing Soon
Santa FeMEX3
8 MWComing Soon
SantiagoSCL1
4 MWComing Soon
Buenos AiresBUE1
4 MWComing Soon
MadridMAD2
8 MWComing Soon
Design your space
Config Rack #01
Power: 50kW
Power: 8kW
Feed: A+B Red
Ready for Deployment
Total Load0 kW
Heat Dissipation0 BTU
Wholesale Single Tenant

Dedicated
Colocation

Rapid deployment of custom data center modules for hyperscalers. From site selection to energization in 120 days.

120 Day Deployments

Built with Bleeding Edge Prefab Modules

Shovel-Ready Catalog

Pre-permitted land bank with secured power capacity.

Proprietary GIS

Site selection driven by our internal geospatial intelligence platform.

Time-to-Power

Real access to large-scale power.

40MW
Land Owned
Utility Feasibility Signed
Querétaro North
SITE ID
QRO-N-04
Permitted
60MW
Substation Active
Permits Complete
Monterrey Ind. Park
SITE ID
MTY-IND-09
Shovel Ready
25MW
Land Secured
Feasibility Study Done
Guadalajara West
SITE ID
GDL-W-02
Land Banking
10MW
Core & Shell Done
Power Connected
Mexico City Edge
SITE ID
MEX-E-12
Shell Complete
100MW
100Ha Campus
Dual Feed High Voltage
El Paso South
SITE ID
ELP-S-01
Master Planned
80MW
EIA Approved
Land Title Clear
Toluca Corridor
SITE ID
TOL-C-05
Permitted
40MW
Land Owned
Utility Feasibility Signed
Querétaro North
SITE ID
QRO-N-04
Permitted
60MW
Substation Active
Permits Complete
Monterrey Ind. Park
SITE ID
MTY-IND-09
Shovel Ready
25MW
Land Secured
Feasibility Study Done
Guadalajara West
SITE ID
GDL-W-02
Land Banking
10MW
Core & Shell Done
Power Connected
Mexico City Edge
SITE ID
MEX-E-12
Shell Complete
100MW
100Ha Campus
Dual Feed High Voltage
El Paso South
SITE ID
ELP-S-01
Master Planned
80MW
EIA Approved
Land Title Clear
Toluca Corridor
SITE ID
TOL-C-05
Permitted
40MW
Land Owned
Utility Feasibility Signed
Querétaro North
SITE ID
QRO-N-04
Permitted
60MW
Substation Active
Permits Complete
Monterrey Ind. Park
SITE ID
MTY-IND-09
Shovel Ready
25MW
Land Secured
Feasibility Study Done
Guadalajara West
SITE ID
GDL-W-02
Land Banking
10MW
Core & Shell Done
Power Connected
Mexico City Edge
SITE ID
MEX-E-12
Shell Complete
100MW
100Ha Campus
Dual Feed High Voltage
El Paso South
SITE ID
ELP-S-01
Master Planned
80MW
EIA Approved
Land Title Clear
Toluca Corridor
SITE ID
TOL-C-05
Permitted
40MW
Land Owned
Utility Feasibility Signed
Querétaro North
SITE ID
QRO-N-04
Permitted
60MW
Substation Active
Permits Complete
Monterrey Ind. Park
SITE ID
MTY-IND-09
Shovel Ready
25MW
Land Secured
Feasibility Study Done
Guadalajara West
SITE ID
GDL-W-02
Land Banking
10MW
Core & Shell Done
Power Connected
Mexico City Edge
SITE ID
MEX-E-12
Shell Complete
100MW
100Ha Campus
Dual Feed High Voltage
El Paso South
SITE ID
ELP-S-01
Master Planned
80MW
EIA Approved
Land Title Clear
Toluca Corridor
SITE ID
TOL-C-05
Permitted

Need Colo Space?